Scheduling
Creating Schedules
Assign checklists to people and places.
Overview
Creating Schedules covers core workflows in TrueSOP for scheduling. Use this guide during onboarding and when training new administrators or operators.
Before you begin
Confirm your tenant is configured with locations, roles, and permissions. Administrators can manage these under tenant settings. Operators need assignment to the relevant locations.
Steps
Follow the in-product workflow for Creating Schedules. TrueSOP links SOPs, checklists, schedules, and evidence so each step is auditable. Document owners should publish approved versions before distribution to the field.
Tips
Use version history for SOP changes, require acknowledgements for critical updates, and pair documentation with scheduled checklists so procedures are executed - not only read.