Energy · Lockout Tagout
LOTO Energy Isolation
Energy Starter Pack · energy-starter
Isolate energy sources before maintenance
EnergyLockout TagoutStarter pack
Overview
LOTO Energy Isolation is included in the Energy Starter Pack industry pack. Import the pack into TrueSOP to use this procedure with linked checklists and schedules.
Scope
Frontline operators, shift leads, and location managers. Adapt steps, roles, and evidence requirements to your organization after import.
Procedure
3 steps from the industry pack
Identify all energy points — Map electrical, mechanical, and stored energy sources
Apply locks and tags — Use personal locks and complete isolation tag details
Verify zero energy state — Conduct test start and confirm no residual energy