SOP Library

Energy · Lockout Tagout

LOTO Energy Isolation

Energy Starter Pack · energy-starter

Isolate energy sources before maintenance

EnergyLockout TagoutStarter pack

Overview

LOTO Energy Isolation is included in the Energy Starter Pack industry pack. Import the pack into TrueSOP to use this procedure with linked checklists and schedules.

Scope

Frontline operators, shift leads, and location managers. Adapt steps, roles, and evidence requirements to your organization after import.

Procedure

3 steps from the industry pack

  1. Identify all energy points — Map electrical, mechanical, and stored energy sources

  2. Apply locks and tags — Use personal locks and complete isolation tag details

  3. Verify zero energy state — Conduct test start and confirm no residual energy