Overview

Line Changeover Process is included in the Manufacturing Starter Pack industry pack. Import the pack into TrueSOP to use this procedure with linked checklists and schedules.

Scope

Frontline operators, shift leads, and location managers. Adapt steps, roles, and evidence requirements to your organization after import.

Procedure

3 steps from the industry pack

  1. Confirm next SKU plan — Validate work order, BOM, and setup sheet for next product

  2. Replace tooling and settings — Install required fixtures and apply approved parameter recipe

  3. Record changeover time — Log downtime start/end and reason codes in production system