Manufacturing · Operations
Line Changeover Process
Manufacturing Starter Pack · manufacturing-starter
Safe and repeatable changeover between products
ManufacturingOperationsStarter pack
Overview
Line Changeover Process is included in the Manufacturing Starter Pack industry pack. Import the pack into TrueSOP to use this procedure with linked checklists and schedules.
Scope
Frontline operators, shift leads, and location managers. Adapt steps, roles, and evidence requirements to your organization after import.
Procedure
3 steps from the industry pack
Confirm next SKU plan — Validate work order, BOM, and setup sheet for next product
Replace tooling and settings — Install required fixtures and apply approved parameter recipe
Record changeover time — Log downtime start/end and reason codes in production system